Impact Notices:
Standard Hours of Construction Operations7:00 AM to 3:30 PM
Read More
LANE CLOSURES
LANE CLOSURESGregory Bateson Building Renovation | Lane Closures & Traffic Impacts
Read More
On Saturday, November 18th there will be lane closures on 8th Street between P Street and S Street from 6:30am until 3:30pm. Please use caution when in the area.

Gregory Bateson Building Renovation
Address: 1600 9th Street, Sacramento, CA 95814
Website: https://bateson.mccarthy.com/
Contact: (279)599-4708
LANE CLOSURES
LANE CLOSURESGregory Bateson Building Renovation | Lane Closures & Traffic Impacts
Read More
On Monday, November 27 through Friday, December 1, 2023 there will be intermittent lane closures around the Gregory Bateson Building at 1600 9th Street, Sacramento.
Lane closures on 8th, 9th, P, and Q Street will be intermittent during the week. Please use caution when in the area.

Gregory Bateson Building Renovation
Address: 1600 9th Street, Sacramento, CA 95814
Website: https://bateson.mccarthy.com/
Contact: (279)599-4708

DGS + McCARTHY + CANNONDESIGN

Gregory Bateson Building Renovation

History of the building

The Gregory Bateson Building was originally constructed in 1981 and the State Historic Preservation Officer designated it as a historically significant building in 2016 due to its innovative design elements, which at the time of the original construction were cutting edge for architectural design and energy efficiency. The four-story, approximately 308,000 GSF building occupies a full city block in downtown Sacramento, California at 1600 9th Street.
Bateson Building
Project information

Overview

The Gregory Bateson Building Renovation will address building wide MEP infrastructure, fire-life safety, accessibility, exterior façade, water intrusion, and vertical transportation deficiencies; remove hazardous materials; repair water damaged building components; replace interior finishes that are at the end of their useful life; provide a modern working environment; and refresh the building exterior and landscaping. Building amenities will include lobbies, balconies, central atrium, training and conference rooms, break rooms, and bicycle storage. 

The Project will include: new HVAC systems and controls; new plumbing systems and fixtures; new storm drainage systems; new fire water service, standpipes and fire sprinkler system, new irrigation water service and upgraded irrigation system; new atrium smoke control system; new fire alarm, security, and access control systems; new lighting and controls; new electrical switchboards, emergency/standby generators and power systems; new low voltage data, audiovisual, and telecommunications systems; renovated passenger and service elevators; repair and replacement of exterior window systems, façade cladding, roofing, and balcony guardrails and waterproofing; new interior and exterior building finishes; new modular systems furniture workspaces, private workspaces, shared workspaces, and special function workspaces; new exterior landscaping and flatwork; and restoration of historic building elements and features. 

KEY Stats

Square Footage

308,000 GSF

Abatement Start

September 2022

New Build Start

March 2023

Completion Date

Winter 2024

Delivery Method

The Bateson Renovation is  a Progressive Design-Build Project

Historic

Recognized by the historic preservation office in 2016

Meet

Our team

Events

Public Outreach

Contact Us

McCarthy and DGS are committed to employing a community workforce consisting of veterans, persons with a criminal record or other involvement with the criminal justice system, persons receiving public assistance, persons emancipated from foster care system, or women interested in joining the trades. Anyone considered a part of these demographics are encouraged to apply for a trades position.

© Bateson Collaborative | DGS + McCarthy + Cannon Design